PM Surya Ghar Muft Bijli Yojana: Step-by-Step Subsidy Process in Rajasthan
The PM Surya Ghar Muft Bijli Yojana is a flagship initiative launched by the Government of India to encourage residential rooftop solar installations across Rajasthan. Homeowners in Kota, Bundi, Baran, and Jhalawar can receive up to ₹78,000 direct central government subsidy credited straight to their bank account.
1. Subsidy Amount Breakdown for Rajasthan Households
- 1kW Rooftop Solar System: ₹30,000 Central Subsidy
- 2kW Rooftop Solar System: ₹60,000 Central Subsidy
- 3kW to 10kW Rooftop Solar System: Flat ₹78,000 Central Subsidy (Maximum Cap)
2. Prerequisites & Eligibility Criteria
To apply for the PM Surya Ghar subsidy in Rajasthan, you must meet the following basic requirements:
- Must own a residential house with suitable unshaded rooftop area (minimum 100 sq. ft. per kW).
- Must have an active electricity connection under KEDL (Kota) or JVVNL (Bundi, Baran, Jhalawar).
- The solar panel installation must be performed by an MNRE-empanelled solar vendor like Surya Volt Solar using ALMM-approved Tier-1 solar modules.
3. Step-by-Step Application Process
Surya Volt Solar manages the complete application process for our customers:
Step 1: Registration on National Portal: Register at pmsuryaghar.gov.in with your electricity consumer number and mobile number.
Step 2: Empanelled Vendor Selection: Choose Surya Volt Solar Energy Solutions as your official empanelled vendor in Kota/Hadoti.
Step 3: Technical Feasibility Approval: KEDL or JVVNL inspects transformer load and issues DISCOM sanction.
Step 4: Installation & Commissioning: We install the solar structure, ALMM solar panels, and grid-tied inverter.
Step 5: Net Metering & Bank Transfer: Bi-directional net meter is installed, commission report is uploaded, and ₹78,000 subsidy is disbursed directly to your bank account within 30 days.
Need Help with PM Surya Ghar Subsidy in Hadoti?
Surya Volt Solar provides end-to-end paperwork & installation across Kota, Bundi, Baran, and Jhalawar.
Book Free Site Survey →